Deyoujiang logo DEYOUJIANGHumidity Control Engineering

Home/Ducted dehumidifiers/Installation simulator

Ducted dehumidifier installation simulator
管道除湿机安装方式 3D 模拟

Compare the air path before selecting equipment. The diagrams explain system logic; final airflow, static pressure, load and controls require project review.
先比较气流组织,再选择设备。图示用于说明系统逻辑;最终风量、机外余压、湿负荷及联动控制需按项目确认。

Internal recirculation内循环除湿
Humid return / 湿回风 Fresh air / 新风 Dry supply / 干燥送风 Exhaust / 排风
Air path / 气流路径

Room return air → ducted dehumidifier → distributed dry air → room

01 / 05

Internal recirculation

内循环除湿方式

The unit repeatedly treats room return air and sends drier air back through a planned supply route. Outdoor ventilation is handled separately.

机组持续处理室内回风,并通过规划的送风路径将干燥空气送回房间;室外新风由其他系统单独承担。

Best fit / 适配产品
DYD ceiling / ducted series
Control focus / 控制重点
Internal latent load and room RH

Benefits / 安装好处

    Problems solved / 解决问题

      Use cases / 使用场景

        Trade-offs / 弊端与限制

          Choose by air path, not by room area alone.按气流组织选择,不要只按面积判断。

          Each route moves a different moisture load and creates different balancing, filtration and control requirements.
          每种路径承担的湿负荷不同,对风量平衡、过滤和控制的要求也不同。

          Mode / 方式Primary air / 主要处理空气Best at / 最擅长Main risk / 主要风险Typical equipment / 常用设备
          Internal recirculation
          内循环
          Room return air
          室内回风
          Stable room RH with low fresh-air load
          低新风负荷下稳定室内湿度
          Does not remove outdoor-air moisture at source
          不能在源头处理新风湿负荷
          DYD ducted series
          DYD 吊顶管道系列
          Fresh-air pretreatment
          新风前置
          Outdoor air
          室外新风
          Intercepting outdoor moisture before it enters
          在入室前拦截室外湿负荷
          High-temperature fresh air may need cooling coordination
          高温新风可能需要冷量协同
          DX fresh-air or project unit
          DX 新风机或项目机型
          Mixed air
          混风
          Fresh + return air
          新风 + 回风
          Ventilation and RH in one air path
          同一路径兼顾换气与控湿
          Dampers and pressure balance are critical
          风阀与压差平衡要求高
          DX fresh-air series
          DX 新风除湿系列
          Relay dehumidification
          中继除湿
          Pre-treated supply air
          预处理后的送风
          A stricter downstream humidity zone
          下游重点区域的更严湿度要求
          More fan energy, controls and condensation checks
          风机能耗、联控及结露检查增加
          DYD project-matched booster
          按项目匹配的 DYD 中继机
          Existing fresh-air integration
          既有新风搭配
          Parallel return-air loop
          独立回风循环
          Retrofit without replacing the ventilation unit
          保留原新风机的改造项目
          Two systems can fight without interlock logic
          缺少联控时两套系统可能相互干扰
          Existing FAU + DYD
          既有新风机 + DYD

          Information required before finalizing the duct layout确定风管方案前需要提供的信息

          The animation is a system concept, not a sizing drawing. Send the real design conditions before equipment selection or duct construction.
          动画是系统原理示意,不是选型或施工图。设备选型及风管施工前应提交真实设计条件。

          Request engineering review / 申请工程复核
          1. 01
            Indoor and outdoor design condition

            室内外设计温度、当前及目标相对湿度

          2. 02
            Airflow and moisture load

            新风量、换气次数、人员、开门及工艺散湿

          3. 03
            Duct and pressure conditions

            风管长度、弯头、过滤段、接口及机外余压

          4. 04
            Installation and controls

            吊装空间、检修口、冷凝水、电源、风阀和联动逻辑